ENSUIR assisted the main contractor by designing the modular units which house the servers which we were later to be fabricated and installed on site. Our involvement included the design and management of the fabrication of the modules as well as the logistics to deliver the units on site in Sweden.
This was a successful project and demonstrated ENSUIR ability to improve the programme and efficiency of a project by delivering a single critical piece of building infrastructure from design through to onsite installation.
This project was completed by ENSUIR International in 2014.